Or. Admin. Code § 330-070-0097

Current through Register Vol. 64, No. 1, January 1, 2025
Section 330-070-0097 - Electricity Producing AEDs

Generating AEDs linked with an electric utility must be installed in accordance with local utility interconnect guidelines and be installed per the state electrical code.

Or. Admin. Code § 330-070-0097

DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE 16-2010, f. & cert. ef. 12-22-10; DOE 11-2011, f. 12-16-11, cert. ef. 1-1-12

Stat. Auth.: ORS 469

Stats. Implemented: ORS 469.170