Or. Admin. Code § 330-068-0085

Current through Register Vol. 63, No. 11, November 1, 2024
Section 330-068-0085 - Project Ranking Formula
(1) TAS:
(a) The Department shall rank TAS applications for building or occupied building according to its potential for ECMs determined by a point system based on data presented in the energy audit submitted with the application;
(b) The Department shall fund TAS applications in rank order starting with the application with the highest ranking value.
(2) ECM:
(a) The Department shall rank ECM project applications using the following formula:

Project Payment = Ranking ValueE

(A) Project Payment = Summation of allowable ECM costs where the allowable cost of each ECM is determined by OAR 330-068-0090(2)(a);
(B) E = The summation of electrical energy savings from all ECMs, savings are equal to the life of each ECM multiplied by its estimated annual kilowatt hour savings.
(b) If a project application contains a direct application renewable resource component, that component of the project estimated first year kilowatt hour savings shall be increased by ten percent for ranking purposes only;
(c) The Department shall fund ECM projects in rank order starting with the project with the lowest ranking value.

Or. Admin. Code § 330-068-0085

DOE 11-1982, f. & ef. 12-17-82; DOE 5-1984, f. & ef. 4-3-84; DOE 3-1985, f. & ef. 3-20-85

Stat. Auth.: ORS 183 & ORS 469

Stats. Implemented: ORS 469