Or. Admin. Code § 330-135-0010

Current through Register Vol. 64, No. 1, January 1, 2025
Section 330-135-0010 - Purpose

The purpose of these rules is to establish procedures to administer ORS 279C.527 through 279C.528 and Oregon Laws 2019 chapter 160 (HB 2496), which require a contracting agency to include an appropriate green energy technology, or if green energy technology is not appropriate an eligible alternative to green energy technology in the construction, reconstruction, or major renovation of a public building by spending an amount equal to at least 1.5 percent of the total contract price associated with that building.

Or. Admin. Code § 330-135-0010

DOE 6-2007, f. 12-31-07, cert. ef. 1-2-08; DOE 15-2012, f. 12-27-12, cert. ef. 1-1-13; DOE 7-2013, f. & cert. ef. 12-23-13; DOE 7-2017, amend filed 12/20/2017, effective 12/20/2017; DOE 2-2019, amend filed 12/19/2019, effective 1/1/2020

Statutory/Other Authority: ORS 469.040, ORS 297C.528 & OL 2019, Ch. 160 (HB 2496)

Statutes/Other Implemented: ORS 297C.528, ORS 279C.527 & OL 2019, Ch. 160 (HB 2496)