Okla. Admin. Code § 730:50-5-22

Current through Vol. 42, No. 4, November 1, 2024
Section 730:50-5-22 - Agriculture permits

Agriculture permits shall be governed by 47 O.S. §14-118(e).

(1) Transporting of raw forest products shall not be permitted on the National System of Interstate and Defense Highways and shall require:
(A) An annual permit with a fee of Twenty-five Dollars ($25.00)
(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.
(C) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.
(2) Transporting of round baled hay requires:
(A) An annual permit with a fee of Twenty-five Dollars ($25.00).
(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.
(C) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.
(3) Transporting of soil conservation equipment requires:
(A) An annual permit with a fee of Twenty-five Dollars ($25.00).
(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.
(C) Travel on the National System of Interstate and Defense Highways shall not be permitted.
(D) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.

Okla. Admin. Code § 730:50-5-22

Adopted by Oklahoma Register, Volume 40, Issue 24, September 1, 2023, eff. 9/11/2023