Current through Vol. 42, No. 4, November 1, 2024
Section 730:30-7-1 - License agreement; annual license feeThe Department may execute a license agreement with a utility company or governmental political subdivision, permitting them to attach their public service or public convenience utility line to a bridge, subject to the following conditions:
(1) The proposed method of attachment submitted by the utility company or governmental political subdivision shall not encroach on the waterway or roadway, walkway or railing of the bridge and shall not overstress the structure so as to impair its structural adequacy, and shall not pose any detrimental effect to the bridge. The submission shall include detailed plans showing the proposed method of attachment. The Bridge Division may reject or require alterations to the proposed method of attachment to protect the bridge. Approved plans shall be stamped by the Bridge Division and considered part of the agreement. The Bridge Division shall prepare the agreement document.(2) The utility company or governmental political subdivision shall execute the Department's standard license agreement. The utility company, upon completion of the attachment installation, shall pay the annual license fee listed in the license agreement. The utility company shall pay the fee annually until the termination of the agreement. The fee amount shall be based on the Schedule of Annual License Fees provided as Appendix C to this chapter.Okla. Admin. Code § 730:30-7-1
Amended at 18 Ok Reg 1369, eff 5-11-01