Okla. Admin. Code § 252:653-7-6

Current through Vol. 41, No. 19, June 17, 2024
Section 252:653-7-6 - Water delivery pilot test

In addition to the requirements of OAC 252:653-7-2, a water delivery pilot test plan shall be included as part of the permit application. The plan shall include the following, as applicable:

(1)Recharge well(s). Field injectivity tests shall be conducted to assist in the design of the operating parameters of the recharge well. Details of the injectivity tests to be conducted shall be included.
(2)Infiltration basin(s). Field infiltration tests shall be conducted to assist in the design of infiltration systems. Infiltration rates must be determined by an appropriate infiltration test to be conducted by the applicant. Details of the infiltration tests to be conducted shall be included.
(3)Other water delivery mechanism. Field tests of the water delivery mechanism shall be conducted as required by DEQ.

Okla. Admin. Code § 252:653-7-6

Adopted by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 9/15/2018