Section 252:633-3-11 - Planning documentsA planning document must be submitted to DEQ by the applicant. The document shall contain the following information:
(1) Identification of the planning area boundaries and characteristics, the existing problems and needs related to water treatment, and the projected needs and problems up to the next 20 years;(2) Cost-effective analysis of feasible water systems or alternatives capable of meeting state and federal requirements;(3) All information necessary for the design of the system;(4) A resolution passed by the applicant which accepts the planning documents and provides a commitment to build the proposed project and a copy of the minutes of the open meeting in which the resolution was passed;(5) Environmental Information as required Subchapter 7;(6) A statement of the project engineer's most current estimate of project cost itemized for major facilities and items including land and right-of-way costs, engineering fees, legal fees, financial advisor fees and/or consultant fees, contingencies (10%), and interest during construction; and(7) A statement of the legal, technical, managerial, and financial capacity to construct, operate and maintain the water system.Okla. Admin. Code § 252:633-3-11
Added at 14 Ok Reg 1139, eff 3-18-97 (emergency); Added at 14 Ok Reg 1690, eff 6-2-97; Amended at 15 Ok Reg 1957, eff 6-1-98