Current through Vol. 42, No. 7, December 16, 2024
Section 252:628-9-1 - General(a)Purpose. No one shall construct, modify, or operate an IPR SWTP or associated systems without first obtaining a Permit to Construct pursuant to OAC 252:656.(b)Intent. This Subchapter implements the permitting process of Part 4, Wastewater and Wastewater Treatment Systems, 27A O.S. Section 2-6-401 et seq., and the Oklahoma Uniform Environmental Permitting Act, 27A O.S. Section 2-14-101 et seq. for IPR SWTPs.(c)Voluntary activity. The discharge of IPR Source Water for surface water augmentation is a voluntary activity by the applicant, and the goal of these rules is to manage the risk to public health, safety, and welfare. The operating and monitoring requirements of this Chapter may require the reduction or cessation of the IPR discharge in accordance with Subchapters 3 and 7 of this Chapter. The applicant shall establish and/or maintain an approved non-IPR outfall separate from the IPR outfall. The approved non-IPR outfall and non-IPR wastewa-ter treatment system shall be capable of design peak flows and wasteload for the existing and ultimate conditions, including the IPR discharge flow and wasteload.Okla. Admin. Code § 252:628-9-1
Adopted by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 9/15/2018