Okla. Admin. Code § 252:626-3-2

Current through Vol. 41, No. 19, June 17, 2024
Section 252:626-3-2 - Applications
(a) Submit legible applications on forms provided by the DEQ and include:
(1) the type of entity that is applying
(2) the legal description,
(3) a minimum of 2 sets of plans and specifications, with at least one set of construction plans printed on 11" x 17" paper and one set of specifications loosely bound that is suitable for scanning,
(4) a final design analysis. Provided, an authorized design-build project may use the flexible permitting process upon approval by DEQ as provided in these rules. If design-build is used, the final design package must encompass the entire completed project,
(5) all appropriate fees, and
(6) engineering report approved by the DEQ for major waterworks projects, or smaller projects utilizing non-conventional processes.
(b) Public entities other than municipalities must provide certified copies of the results of the last election or appointment of the members of the governing body. Public entities must provide a citation of legal authority to own and operate the proposed facility.
(c) Applicants other than public entities must provide copies of documents that created them and provide a citation to their statutory authority.

Okla. Admin. Code § 252:626-3-2

Added at 18 Ok Reg 1612, eff 6-1-01; Amended at 25 Ok Reg 2304, eff 7-11-08
Amended by Oklahoma Register, Volume 31, Issue 24, September 2, 2014, eff. 9/12/2014
Amended by Oklahoma Register, Volume 40, Issue 24, September 1, 2023, eff. 9/15/2023