Okla. Admin. Code § 252:517-9-2

Current through Vol. 41, No. 19, June 17, 2024
Section 252:517-9-2 - Groundwater monitoring systems
(a)Performance standard. The owner or operator of a CCR unit must install a groundwater monitoring system that consists of a sufficient number of wells, installed at appropriate locations and depths, to yield groundwater samples from the uppermost aquifer that:
(1) Accurately represent the quality of background groundwater that has not been affected by leakage from a CCR unit. A determination of background quality may include sampling of wells that are not hydraulically upgradient of the CCR management area where:
(A) Hydrogeologic conditions do not allow the owner or operator of the CCR unit to determine what wells are hydraulically upgradient; or
(B) Sampling at other wells will provide an indication of background groundwater quality that is as representative or more representative than that provided by the upgradient wells; and
(2) Accurately represent the quality of groundwater passing the waste boundary of the CCR unit. The downgradient monitoring system must be installed at the waste boundary that ensures detection of groundwater contamination in the uppermost aquifer. All potential contaminant pathways must be monitored.
(b)Site-specific considerations. The number, spacing, and depths of monitoring systems shall be determined based upon site-specific technical information that must include thorough characterization of:
(1) Aquifer thickness, groundwater flow rate, groundwater flow direction including seasonal and temporal fluctuations in groundwater flow; and
(2) Saturated and unsaturated geologic units and fill materials overlying the uppermost aquifer, materials comprising the uppermost aquifer, and materials comprising the confining unit defining the lower boundary of the uppermost aquifer, including, but not limited to, thicknesses, stratigraphy, lithology, hydraulic conductivities, porosities and effective porosities.
(c)Minimum number. The groundwater monitoring system must include the minimum number of monitoring wells necessary to meet the performance standards specified in paragraph (a) of this Section, based on the site-specific information specified in paragraph (b) of this Section. The groundwater monitoring system must contain:
(1) A minimum of one upgradient and three downgradient monitoring wells; and
(2) Additional monitoring wells as necessary to accurately represent the quality of background groundwater that has not been affected by leakage from the CCR unit and the quality of groundwater passing the waste boundary of the CCR unit.
(d)Multi-unit groundwater monitoring system. The owner or operator of multiple CCR units may install a multiunit groundwater monitoring system instead of separate groundwater monitoring systems for each CCR unit.
(1) The multiunit groundwater monitoring system must be equally as capable of detecting monitored constituents at the waste boundary of the CCR unit as the individual groundwater monitoring system specified in paragraphs (a) through (c) of this Section for each CCR unit based on the following factors:
(A) Number, spacing, and orientation of each CCR unit;
(B) Hydrogeologic setting;
(C) Site history; and
(D) Engineering design of the CCR unit.
(2) [RESERVED]
(e)Monitoring wells. Monitoring wells must be constructed in accordance with OAC 252:517-7-3.
(1) The owner or operator of the CCR unit must document and include in the operating record the design, installation, development, and decommissioning of any monitoring wells, piezometers and other measurement, sampling, and analytical devices. The qualified professional engineer must be given access to this documentation when completing the groundwater monitoring system certification required under paragraph (f) of this Section.
(2) The monitoring wells, piezometers, and other measurement, sampling, and analytical devices must be operated and maintained so that they perform to the design specifications throughout the life of the monitoring program.
(f)PE certification. The owner or operator must obtain a certification from a qualified professional engineer stating that the groundwater monitoring system has been designed and constructed to meet the requirements of this Section. If the groundwater monitoring system includes the minimum number of monitoring wells specified in paragraph (c)(1) of this Section, the certification must document the basis supporting this determination.
(g)DEQ approval required. A plan meeting the requirements of this section must be submitted to DEQ for approval prior to installation of the groundwater monitoring system.
(h)Recordkeeping. The owner or operator of the CCR unit must comply with the recordkeeping requirements specified in OAC 252:517-19-1(h), the notification requirements specified in OAC 252:517-19-2(g), and the internet requirements specified in OAC 252:517-19-3(h).

Okla. Admin. Code § 252:517-9-2

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016
Amended by Oklahoma Register, Volume 38, Issue 24, September 1, 2021, eff. 9/15/2021