Okla. Admin. Code § 252:517-3-36

Current through Vol. 42, No. 4, November 1, 2024
Section 252:517-3-36 - Site map
(a)Required map. The permit application shall include a site map, which may be the existing contour map.
(b)Required details. The site map shall show the following, as applicable to the facility:
(1) the dimensions of the permit boundary as indicated by legal description;
(2) the receiving processing, storage or disposal areas;
(3) buffer zones;
(4) the locations and surface elevations of each borehole, monitor well, test well, monitoring site, test pit, sampling site and permanent benchmarks;
(5) the surface and top of casing elevations for each monitoring well;
(6) the surface drainage, including location of diversion ditches, dikes, dams, pits, ponds, lagoons, berms, terraces and other relevant information;
(7) the location of fencing and gates, utility lines, pipelines, and easements;
(8) the access roads into and on the site;
(9) employee and equipment shelters; and
(10) on- and off-site soil borrow areas.

Okla. Admin. Code § 252:517-3-36

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016