Okla. Admin. Code § 252:517-3-34

Current through Vol. 41, No. 19, June 17, 2024
Section 252:517-3-34 - Quadrangle topographic map
(a)Required map. The permit application shall include an original U.S. Geological Survey 7.5 minute series topographic quadrangle map.
(1) If 7.5 minute series maps have not been printed, then 15 minute series may be used.
(2) If the CCR unit is located on the edge of the quadrangle, then adjoining maps shall be provided.
(b)Required details. The quadrangle topographic map shall clearly depict:
(1) the location of the facility permit boundaries;
(2) access routes within one mile of the facility;
(3) homes and buildings within one mile of the facility;
(4) public water and wastewater collection, treatment, and distribution facilities within one mile of the facility;
(5) receiving waters and surface variations within one mile of the facility; and
(6) water wells, including private and municipal, potable and irrigation water within one mile of the facility.

Okla. Admin. Code § 252:517-3-34

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016