Current through Vol. 42, No. 8, January 2, 2025
Section 252:515-43-71 - Class I and Class II design standards Class I and Class II composting facilities shall meet the following design:
(1)Location restrictions. Facilities shall meet all location restrictions listed in Subchapter 5, Part 3 of this Chapter.(2)Contact water control. Contact water must be segregated and directed to containment, recycling, and/or treatment systems.(3)Stormwater run-on / run-off control. The composting area shall be designed, constructed and maintained to prevent the run-on / run-off of stormwater and be in compliance with Subchapter 17 including OPDES permitting, if required by OAC 252:606.(4)All-weather pad. Composting areas shall be constructed of, or covered with, material which will allow operation during all types of weather. Composting operations shall take place on an all-weather composting pad. The all-weather pad must be designed, constructed, and maintained to: (A) prevent ponding and impede vertical movement of potential contaminants from contact water;(B) reliably transmit any free liquid present during the storage, treatment, and processing of materials laterally to a containment, recycling, and/or treatment unit sized to handle a minimum 24 hour, 25 year storm event to prevent liquids from entering surface water or groundwater; and(C) prevent conditions that could contribute to, or cause a release to the environment.Okla. Admin. Code § 252:515-43-71
Adopted by Oklahoma Register, Volume 34, Issue 24, September 1, 2017, eff. 9/15/2017