Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-3-79 - Top of liner contour map(a)Required map. The permit application shall include a top of liner contour map showing: (1) contours, at two foot intervals, of the top of the liner; and(2) the locations of the proposed monitor wells.(b)Liner construction. Details of liner construction may be provided on this map or as a separate drawing.Okla. Admin. Code § 252:515-3-79
Added at 20 Ok Reg 1151, eff 6-1-03