Current through Vol. 42, No. 8, January 2, 2025
Section 252:515-3-56 - Site map(a)Required map. The permit application shall include a site map, which may be the existing contour map.(b)Required details. The site map shall show the following, as applicable to the facility: (1) the dimensions of the permit boundary as indicated by legal description;(2) the receiving processing, storage or disposal areas;(4) the locations and surface elevations of each borehole, monitor well, test well, monitoring site, test pit, sampling site and permanent benchmarks;(5) the surface and top of casing elevations for each monitoring well or gas probe;(6) the surface drainage, including location of diversion ditches, dikes, dams, pits, ponds, lagoons, berms, terraces and other relevant information;(7) the location of fencing and gates, utility lines, pipelines, and easements;(8) the access roads into and on the site;(9) employee and equipment shelters; and(10) on- and off-site soil borrow areas.Okla. Admin. Code § 252:515-3-56
Added at 20 Ok Reg 1151, eff 6-1-03