Okla. Admin. Code § 252:515-25-56

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-25-56 - Certification of post-closure performance
(a)Certification required. At the conclusion of the post-closure period, a Certification of Post-closure Performance shall be submitted to the DEQ. The Certification shall:
(1) state the facility was maintained and monitored in accordance with the approved post-closure plan, the permit, and applicable rules;
(2) indicate whether monitoring throughout the post-closure period has shown the presence of elevated levels of any constituent or if any evidence of contamination related to site operations has been found and, if so, what corrective measures were taken; and
(3) be maintained in the operating record.
(b)In lieu of annual report. The Certification of Post-closure Performance shall be submitted in lieu of the final annual post-closure report.
(c)Professional engineer seal. The Certification of Post-closure Performance shall be prepared and sealed by an independent professional engineer licensed in the State of Oklahoma if the facility was permitted to serve a population or population equivalent of greater than 5,000.

Okla. Admin. Code § 252:515-25-56

Added at 20 Ok Reg 1151, eff 6-1-03