Okla. Admin. Code § 252:515-17-2

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-17-2 - Run-on/run-off control systems

All active land disposal facilities shall be designed, constructed, and maintained with:

(1) a run-on control system to prevent flow onto active portions of the facility during the peak discharge from a 24-hour, 25-year storm; and
(2) a run-off control system with sufficient capacity to collect and control all contaminated stormwater resulting from a 24-hour, 25-year storm.

Okla. Admin. Code § 252:515-17-2

Added at 20 Ok Reg 1151, eff 6-1-03