Okla. Admin. Code § 252:515-13-53

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-13-53 - Recirculation
(a)Plan required. Leachate may be recirculated in accordance with a plan approved by the DEQ.
(b)Location. Recirculation may only occur over areas with a composite liner and leachate collection system such that all leachate remains on the composite lined cell.
(c)Testing. At a minimum, the recirculation plan shall contain a routine testing protocol designed to assess the treatment effectiveness of the recirculation program.
(d)DEQ approval required. Leachate may not be recirculated until the recirculation plan has been approved by the DEQ.

Okla. Admin. Code § 252:515-13-53

Added at 20 Ok Reg 1151, eff 6-1-03