Okla. Admin. Code § 25:40-3-1

Current through Vol. 41, No. 24, September 3, 2024
Section 25:40-3-1 - Notification of intent to build a wind energy facility and other notices
(a) The owner of a wind energy facility shall submit to the Oklahoma Department of Aerospace and Aeronautics copies of all initial FAA 7460-1 form(s) for all individual wind turbines or any other individual structure that requires a FAA form 7460-1 that is part of a wind energy facility within thirty (30) days of the initial filing with the FAA.
(b) If the owner of a wind energy facility is required to file subsequent 7460-1 forms with the FAA due to changing locations or heights of individual structures from the locations or heights originally proposed in the initial 7460-1 forms submitted to the Oklahoma Department of Aerospace and Aeronautics, the owner shall, within ten (10) calendar days of filing with the FAA, submit such subsequent 7460-1 forms to the Oklahoma Department of Aerospace and Aeronautics.
(c) The 7460-1 form(s) shall be submitted electronically unless prior approval of another format has been granted by the Director. A cover letter shall accompany the 7460-1 form(s) detailing the name of the project, the owner of the wind energy facility, and indicating whether the submittal is for initial 7460-1 form(s) or subsequent 7460-1 form(s).

Okla. Admin. Code § 25:40-3-1

Adopted by Oklahoma Register, Volume 37, Issue 24, September 1, 2020, eff. 9/11/2020
Amended by Oklahoma Register, Volume 41, Issue 22, August 1, 2024, eff. 8/11/2024