Okla. Admin. Code § 25:30-3-1

Current through Vol. 42, No. 4, November 1, 2024
Section 25:30-3-1 - Application form and time of notice
(a)Form. Each person that is required to file for a permit from the Department in accordance with 25:30-1-3, shall send one original and one copy of Department form A-1 to the Department or on an electronic form approved by the Department. Copies of the Form may be obtained free of charge from the Department's Office or downloaded in electronic format from the Department's website. The Department will make available a web-based application for online permit application that is consistent with the requirements set forth in Title 62 of the Oklahoma Statutes.
(b)Additional application requirements. Applications to the Department for a permit in accordance with the provisions of these rules shall include the following in addition to the requirements of 25:30-3-1(a):
(1) For construction in a primary surface or runway protection zone, in accordance with section 25: 30-5-1:
(A) The following statement signed by a legal representative of the applicant: "The applicant acknowledges for itself, its heirs, its successors, ant its assigns, that the real estate described in this application is located in the primary surface or the runway protection zone of a public-use airport, and that the applicant is building a structure upon this real estate, with the full knowledge and acceptance that it may be incompatible with the normal airport operations including the landing and takeoff of aircraft."
(B) if notice is required to be filed with FAA, a copy of the FAA Form 7460-1, "Notice of Proposed Construction or Alteration", as described in 14 CFR part 77, sub-part B, Section 17, to be submitted to the FAA.
(2) For construction or alteration of a structure in a horizontal, conical, or approach surface in accordance with section 25:30-5-2: a copy of FAA Form 7460-1, if required to be submitted to the FAA.
(c)When to file for a permit. If FAA Form 7460-1 is required to be filed for the proposed construction, then an application for a permit pursuant to Section 25:30- 1-3 shall be filed at the same time the FAA Form 7460-1 is sent to the FAA, or at any time before that. If FAA Form 7460-1 is not required to be filed with the FAA, then the application shall be filed at least thirty (30) days before the earlier of the following:
(1) The date the proposed construction or alteration is to begin; or
(2) The date an application for a construction or building permit is to be filed with the municipality.

Okla. Admin. Code § 25:30-3-1

Added at 28 Ok Reg 77, eff 9-17-10 (emergency); Added at 28 Ok Reg 766, eff 5-26-11
Amended by Oklahoma Register, Volume 41, Issue 22, August 1, 2024, eff. 8/11/2024