For an individual licensed both as an engineer and surveyor, the number of PDH's required shall remain 30 per biennial renewal period or 15 per calendar year, at least 1/3 of which shall be obtained in each profession. Dual licensees must comply with the provisions of OAC 245:15-11-5(c) regarding the Oklahoma Minimum Standards for the Practice of Land Surveying.
Okla. Admin. Code § 245:15-11-13