Section 165:25-1-48 - Tank and line tightness testing(a) Tank and line tightness testing results in which any part of the tank system tested does not pass must be reported to the PSTD within twenty-four (24) hours by the owner, operator, their employees or agents, and also independently by the person or company performing the test. Complete test results must be submitted within seven (7) days of testing.(b) Tank tests must include both the wetted portion and ullage portion of the tank.(c) Hydrostatic line tightness tests and line leak detector tests must be conducted by a licensed tester, if applicable, in accordance with manufacturer's instructions, and reported on the prescribed PSTD form.(d) The licensed tester performing line and leak detector tests must also certify that the line leak detector is installed properly.(e) All personnel performing tank and line testing must have the required license, education, experience, knowledge and competence to correctly perform testing services in accordance with the testing equipment, manufacturer certification and applicable industry standards or codes.(f) Tank, line and line leak detector testing must be scheduled by submitting the PSTD scheduling form in the established online format and PSTD staff may be present.Okla. Admin. Code § 165:25-1-48
Amended at 18 Ok Reg 2378, eff 7-1-01; Amended at 21 Ok Reg 2036, eff 7-1-04; Amended at 22 Ok Reg 1730, eff 7-1-05; Amended at 23 Ok Reg 2261, eff 7-1-06; Amended at 25 Ok Reg 1867, eff 7-1-08Amended by Oklahoma Register, Volume 31, Issue 24, September 2, 2014, eff. 9/12/2014Amended by Oklahoma Register, Volume 32, Issue 23, August 17, 2015, eff. 8/27/2015Amended by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 10/1/2018Amended by Oklahoma Register, Volume 39, Issue 24, September 1, 2022, eff. 10/1/2022Amended by Oklahoma Register, Volume 41, Issue 23, August 15, 2024, eff. 10/1/2024