Okla. Admin. Code § 165:14-3-3

Current through Vol. 41, No. 24, September 3, 2024
Section 165:14-3-3 - Registration and contact information
(a) On or before January 1, 2023, or within thirty (30) days of opening a new public charging station, each charging station operator operating a public charging station shall provide the following information to PUD for each public charging station:
(1) The station name, complete physical address, type of facility where the station is located, and if necessary, directions from the nearest intersection;
(2) Global positioning system ("GPS") coordinates;
(3) Date the station opened;
(4) Access days and times;
(5) The number of each type of EVSE port located at the charging station (e.g. Level 1, Level 2, DC fast charger);
(6) Electric vehicle connector types usable;
(7) Electric vehicle charging network, if applicable; and
(8) How the customer is charged.
(b) Each charging station operator shall include the name(s), mailing address(es), electronic mail address(es) and telephone number(s) of the individual(s) primarily responsible for:
(1) Providing customer service;
(2) Repair and maintenance;
(3) Answering complaints;
(4) Authorizing and/or furnishing refunds to customers;
(5) Regulatory matters;
(6) Serving as primary emergency contact;
(7) Serving as contact for after-hours emergency(ies);
(8) Providing legal representation for regulatory matters;
(9) Reporting requirements;
(10) Serving as community liaison; and
(11) Engineering operations, meter tests, and repairs.
(c) If the information listed in (a) or (b) is unavailable, the charging station operator may seek a waiver from the PUD Director by making the request in writing.
(d) Any changes to the information in (a) or (b) shall be provided to PUD within thirty (30) calendar days of the change.
(e) The contact person under (b) may be the same for one or more of the listed items and shall be furnished applicable to each specific public charging station, if different, so that the PUD will be able to reach the responsible person at any time.
(f) Each charging station operator operating a public charging station shall promptly furnish such other information as the PUD may request.

Okla. Admin. Code § 165:14-3-3

Adopted by Oklahoma Register, Volume 39, Issue 24, September 1, 2022, eff. 10/1/2022