All standard certificate applications shall include fully developed information on the proposed sites or routes. A standard certificate application for an electric transmission line or gas pipeline should also identify a proposed alternative route together with a brief explanation of why the alternative route is less preferred than the proposed route. Information as to the alternative route need not be fully developed as part of the application filing.
Ohio Admin. Code 4906-3-05
Five Year Review (FYR) Dates: 05/20/2029
Promulgated Under: 111.15
Statutory Authority: 4906.03, 4906.20
Rule Amplifies: 4906.03, 4906.06, 4906.10, 4906.13, 4906.20
Prior effective dates: 12/27/1976, 06/10/1989, 08/28/1998, 12/15/2013, 01/25/2009, 05/07/2009, 12/11/2015