When existing elevators are used for the removal of material and debris, employees shall be instructed not to load elevators beyond the rated capacity. Material hoists, when used, shall conform to the requirements of paragraph (D)(2) of rule 4123:1-3-07 of the Administrative Code.
Any openings cut in a floor for the disposal of material and debris shall be no larger in size than twenty-five per cent of the aggregate of the total floor area, unless the lateral supports of the removed flooring remain in place. Floors weakened or otherwise made unsafe by demolition operations shall be shored to carry safely the intended imposed load from demolition operations.
Storage space into which material and debris are dumped shall be blocked off, except for openings necessary for their removal. Such openings shall be kept closed at all times when material or debris is not being removed.
All employees shall be removed from areas directly below floors or similar elevations prior to the demolition of walls, sections of walls, chimneys or other parts of the building which may fall in mass upon such upper floors or elevations.
In demolishing masonry walls with hand labor, scaffolding shall be provided unless an interior floor is located no more than twelve feet below the working level. All scaffolds used in demolition work shall be substantially supported and shall conform to the requirements of rule 4123:1-3-10 of the Administrative Code.
Walkways or ladders shall be provided to enable employees to safely reach or leave any scaffold or wall.
Stairways in use shall be substantially supported.
Employees shall not be required to work from or ride crane loads, hooks, demolition balls or buckets designed to carry materials.
Employees shall not be required to drop structural steel except into a specially barricaded or otherwise fully protected area.
Prior to erecting any derrick or other hoisting device on any floor support, shoring shall be designed and erected to provide a factor of safety of no less than four.
The area affected by demolition balls and clamshell buckets shall be barricaded to protect employees. Only those employees necessary for the performance of these operations shall be required to be in the barricaded area when these operations are being performed.
A demolition ball shall be attached to the load line with a swivel-type connection to prevent twisting of the load line, and shall be attached so that the weight cannot become accidentally disconnected. The weight of the demolition ball shall not exceed fifty per cent of the crane's rated load based on the maximum length and angle of the boom.
Windows in crane cabs used with balling operations shall be protected with heavy-gauge metal screening having openings large enough that the operator's vision is not obscured, but no larger than two inches, or with safety glass that will provide equivalent protection.
Selective demolition by explosives shall be conducted in accordance with the applicable sections of rule 4123:1-3-15 of the Administrative Code.
Ohio Admin. Code 4123:1-3-19
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 04/01/1968, 11/01/1979, 03/01/2013
Promulgated Under: 119.03
Statutory Authority: 4121.12, 4121.121, 4121.13, Ohio Const. Art. II, Sec. 35
Rule Amplifies: 4121.47
Prior Effective Dates: 4/1/68, 11/1/79, 2/14/13