[Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal statutory provisions referenced in this rule, see rules 3745-1-03 and 3745-1-50 of the Administrative Code.]
[Comment: For definitions of terms used in this rule, see rules 3745-1-02 and 3745-1-50 of the Administrative Code.]
[Comment: Social considerations may include, but are not limited to, public safety.]
[Comment: Additional information on the public need demonstration can be found on pages 6 to 7 of the ORAM manual, as cited in rule 3745-1-50 of the Administrative Code.]
Table E-1
Category of wetland impacted | Wetland type | Minimum mitigation ratio | Wetland replacement category |
1 | Non-forested | 1.5 : 1 | 2 or 3 |
Forested | 1.5 : 1 | ||
2 | Non-forested | 2.0 : 1 | 2 or 3 |
Forested | 2.5 : 1 | ||
3 | Non-forested | 2.5 : 1 | 3 |
Forested | 3.0 : 1 |
E = [(LMR x N) - RE] x 2, where:
E = minimum number of acres of wetlands to be enhanced.
LMR = left side of mitigation ratio, from the wetland mitigation table E-1of this rule.
N = number of acres of impacted wetlands.
RE = number of acres of proposed reestablishment (restoration) or establishment (creation) wetlands
For example, if the mitigation ratio for compensatory mitigation of a category 3 forested wetland is 3:1 for an impact to two acres of wetland, an acceptable mitigation plan may include at least two acres of reestablished (restored) or established (created) wetlands and at least eight acres of rehabilitated (enhanced) wetlands.
P = [(LMR x N) - RE] x 2, where:
P = minimum number of acres of wetlands to be preserved.
LMR = left side of mitigation ratio, from wetland mitigation table E-1 of this rule.
N = number of acres of impacted wetlands.
RE = number of acres of proposed reestablishment (restoration) or establishment (creation) wetlands.
For example, if the mitigation ratio for compensatory mitigation of a category 3 forested wetland is 3:1 for an impact to two acres of wetland, an acceptable compensatory mitigation plan may include at least two acres of reestablished (restored) wetlands and at least eight acres of preserved wetlands.
When mitigation credits are not available, permittees may propose alternate compensatory mitigation to fulfill the permit requirements for the director to consider. The director may consider reductions in the compensatory mitigation based upon the ecological status of the original compensatory mitigation project.
Ohio Admin. Code 3745-1-54
Five Year Review (FYR) Dates: 4/1/2024 and 10/10/2029
Promulgated Under: 119.03
Statutory Authority: 6111.041, 6111.12, 6111.30
Rule Amplifies: 6111.041, 6111.12, 6111.30
Prior Effective Dates: 05/01/1998, 10/17/2003, 07/30/2018