Permanent impoundments
Sediment ponds
Existing bodies of water
Spillway
Overflow pipe (show inside diameter)
Electric distribution line
Electric transmission line (5kv or greater)
Telephone
Gas line
Oil line
Water line
Occupied building
Unoccupied building
Mineral outcrop line
Final highwall
Beginning point
Ending point
Direction arrow (to show how mining will proceed)
Test holes
Contour lines
Property lines
Dike
Diversion ditch
Natural drainage
Pumped drainage
Natural drainage (intermittent flow)
Haul road
Hard surface road
Gravel road or driveway
Oil well
Gas well
Water well
Deep mine shaft
Drift or slope mine entry
Areas to be planted in trees (only needed if entire area is not to be planted in trees)
Existing highwall or active mining face
Toe of spoil or overburden
Cross section
Proposed spoil area
Sump
Ohio Admin. Code 1501:14-1-12
Five Year Review (FYR) Dates: 11/15/2023 and 02/01/2029
Promulgated Under: 119.03
Statutory Authority: 1514.08
Rule Amplifies: 1514.05, 1514.03, 1514.021, 1514.02, 1514.011
Prior Effective Dates: 01/15/1975, 09/07/1996, 10/06/2011, 12/18/2017