All stream crossings must comply with applicable floodplain regulations and regulatory floodway requirements per North Dakota Century Code chapter 61-16.2. If a stream crossing is being replaced and buildings or structures are located upstream from the crossing, the stream crossing must not be reconstructed in a manner that increases the likelihood of impacts to those upstream buildings or structures, even if the capacity of the crossing being replaced was greater than the capacity otherwise required by this chapter. Any stream crossing constructed as part of a newly constructed roadway must be constructed to pass the federal emergency management agency identified one-percent annual-chance flood event flow without the resulting increase in headwater impacting any existing buildings or structures. Structures, for the purposes of this section, include grain bins, silos, feedlots, and corrals. Structures do not include pasture fencing.
N.D. Admin Code 89-14-01-04
General Authority: NDCC 24-02-01.1, 24-02-01.5, 61-03-13
Law Implemented: NDCC 24-03-06, 24-03-08, 24-06-26.1