N.D. Admin. Code 85-04-03-05

Current through Supplement No. 395, January, 2025
Section 85-04-03-05 - Issuance of a permit for permanent improvement

The commissioner may determine whether to issue a permit for a permanent improvement and to determine the maximum project cost, rent credit, cost-share, and depreciation amounts. The commissioner may impose such terms on a permit as the commissioner deems necessary. A permit must be issued prior to site preparation or construction.

N.D. Admin Code 85-04-03-05

Adopted by Administrative Rules Supplement 375, January 2020, effective 1/1/2020.

General Authority: NDCC 28-32-02

Law Implemented: NDCC 15-08-26