The commissioner may determine whether to issue a permit for a permanent improvement and to determine the maximum project cost, rent credit, cost-share, and depreciation amounts. The commissioner may impose such terms on a permit as the commissioner deems necessary. A permit must be issued prior to site preparation or construction.
N.D. Admin Code 85-04-03-05
General Authority: NDCC 28-32-02
Law Implemented: NDCC 15-08-26