N.D. Admin. Code 85-04-02-18

Current through Supplement No. 395, January, 2025
Section 85-04-02-18 - Conditions on expiration, termination, or surrender

At the expiration, termination, or surrender of a construction aggregate lease and, upon the completion of reclamation, unless otherwise waived, the lessee shall remove its property from the construction aggregate leased premises within one hundred twenty days from the date of expiration, termination, surrender, or the date reclamation is completed. The lessee is liable to the board for the costs of removal of any property remaining on the construction aggregate leased premises after the deadline for removal. If the lessee does not remove all stockpiled construction aggregate from the construction aggregate leased premises by the construction aggregate lease expiration, termination, or surrender date, it is considered abandoned and becomes the property of the board.

N.D. Admin Code 85-04-02-18

Adopted by Administrative Rules Supplement 375, January 2020, effective 1/1/2020.

General Authority: NDCC 15-05-18

Law Implemented: NDCC 15-05-18