All field inspection of small grain will be made after the crop is fully headed . A field harvested before inspection will not be eligible for certification.
N.D. Admin Code 74-03-02-02
General Authority: NDCC 4.1-52-10
Law Implemented: NDCC 4.1-52-10, 4.1-53-42