N.D. Admin. Code 69-06-11-02

Current through Supplement No. 393, July, 2024
Section 69-06-11-02 - Implementation
1. A wind energy conversion facility for which a certificate of site compatibility was issued after June 5, 2016, must be equipped with a functioning light-mitigating technology in compliance with this chapter by December 31, 2019.
2. A wind energy conversion facility for which a certificate of site compatibility was issued before June 5, 2016, must be equipped with a functioning light-mitigating technology in compliance with this chapter by December 31, 2021. The commission may grant an extension of time based on technical or economic feasibility considerations.
3. The commission may grant a waiver of this chapter for a wind energy conversion facility designed for or capable of generating no more than five megawatts of electricity upon a motion demonstrating good cause for the waiver.
4. To allow proper conspicuity of a turbine at night during construction, a turbine may be lighted with temporary lighting until the permanent lighting configuration, including the light-mitigating technology, is implemented.
5. Owner shall provide written notice to the commission upon implementation of light-mitigating technology in compliance with this chapter.
6. Owner is solely responsible for any costs associated with the implementation, operation, and maintenance of each light-mitigating technology system.
7. An extension request must be in writing and contain:
a. The purpose of the extension;
b. A description of the light-mitigating technologies submitted to the federal aviation administration;
c. The technical or economic inability to implement light-mitigating technology systems;
d. The length of extension requested; and
e. Any other information requested by the commission.

N.D. Admin Code 69-06-11-02

Adopted by Administrative Rules Supplement 369, July 2018, effective 7/1/2018.

General Authority: NDCC 28-32-02, 49-22-18

Law Implemented: NDCC 49-22-16.4