N.D. Admin. Code 69-05.2-21-05

Current through Supplement No. 393, July, 2024
Section 69-05.2-21-05 - Performance standards - Backfilling and grading -Slippage and piping zones

The commission may require the operator to use current research findings and the best technology currently available to minimize subsurface piping in the spoil and slippage at the suitable plant growth material spoil interface.

N.D. Admin Code 69-05.2-21-05

Effective August 1, 1980; amended effective May 1, 1990.

General Authority: NDCC 38-14.1-03

Law Implemented: NDCC 38-14.1-24