Before abandoning the permit area. the operator shall renovate all permanent sedimentation ponds, diversions, impoundments, and treatment facilities to meet criteria specified in the detailed design plan for the permanent structures and impoundments.
N.D. Admin Code 69-05.2-16-19
General Authority: NDCC 38-14.1-03
Law Implemented: NDCC 38-14.1-24