Any operator adversely affected by a determination of the director of either an application or an amended application for restimulation well certification made under this chapter may petition the commission within thirty days after the entry of such a determination for a hearing in accordance with the provisions of North Dakota Century Code chapter 38-08 and chapter 43-02-03.
N.D. Admin Code 43-02-15-05
General Authority: NDCC 38-08-04(1)(e)
Law Implemented: NDCC 38-08-04(1)(e), 57-51.1-01