Upon agreement between the storage facility operator and the commission, the commission may modify a permit to make the corrections or allowances without the storage operator filing an application to amend a permit. Any permit modification not processed as a minor modification under this section must be filed as an application to amend an existing permit under section 43-02-14-18. Minor modifications may include:
1. Correct typographical errors.2. Require more frequent monitoring or reporting by the storage operator.3. Change quantities or types of fluids or gases injected which are within the capacity of the facility as permitted and, in the judgement of the commission, would not interfere with the operation of the facility or its ability to meet conditions described in the permit and would not change its classification.4. Change construction requirements approved by the commission, provided that any such alteration must comply with the requirements of this chapter and no such changes are physically incorporated into construction of the well before approval of the modification by the commission.5. Amending any of the plans of this chapter where the modifications merely clarify or correct the plan, as determined by the commission.N.D. Admin Code 43-02-14-19.1
Adopted by Administrative Rules Supplement 2022-384, April 2022, effective 4/1/2022.General Authority: NDCC 38-08-04
Law Implemented: NDCC 38-25