The proper plugging of an injection well requires the well be plugged with cement or other types of plugs, or both, in a manner which will not allow movement of fluids into an underground source of drinking water. The operator shall file a notice of intention to plug on a form provided by the director and shall obtain the director's approval of the plugging method before the commencement of plugging operations.
N.D. Admin Code 43-02-14-12
General Authority: NDCC 38-08-04
Law Implemented: NDCC 38-25