N.D. Admin. Code 43-02-10-07

Current through Supplement No. 395, January, 2025
Section 43-02-10-07 - Incremental production determination for a tertiary recovery project
1.
a.In a unit where there has not been a secondary recovery project and a tertiary project is commenced, the commission will establish a primary production decline curve. In such instance, incremental production is the production above the established primary production decline curve which production is a result of the tertiary recovery project.
b. The total amount of oil that would have been produced from the unit if the tertiary recovery project had not been commenced will be determined by the commission through the use of a computer-generated production decline curve developed by software used by the commission at the time of certification. The decline curve will be a production versus time plot. The oil production and the time used to develop the curve will be that production occurring and period of time from the latest peak in production through the last month of oil production prior to the month in which the tertiary recovery project operations commence. However, the director shall have discretionary authority to select a different period of time to establish the decline curve if deemed necessary to obtain a more accurate estimate of the ultimate primary production.
c. The production decline curve established in subdivision b of this subsection is projected from the end of the last month in which production was used to develop the primary decline curve to a producing rate of one barrel of oil per well per day. All production above the projected decline curve is incremental production and production below the decline curve is primary production. The total projected primary production, on a monthly basis in numerical form, is derived from the projected primary production decline curve. A copy of the projected monthly primary production, in numerical form, will be furnished to the unit operator and the tax commissioner.
2. In a unit which commences a tertiary recovery project where there is or has been a secondary recovery project and the commission cannot establish an accurate production decline curve, incremental production will be determined pursuant to paragraph 5 of subdivision c of subsection 5 of North Dakota Century Code section 57-51.1-03.
3.
a.In a unit which commences a tertiary recovery project where there is or has been a secondary recovery project and where the commission can establish an accurate production decline curve, incremental production is the production above the established production decline curve which production is a result of the tertiary recovery project.
b. The total amount of oil that would have been produced from the unit if the tertiary recovery project had not been commenced will be determined by the commission through the use of a computer-generated production decline curve developed by software used by the commission at the time of certification. The decline curve will be a production versus time plot. The oil production and the time used to develop the curve will be that production occurring and period of time from the latest peak in production through the last month of oil production prior to the month in which the tertiary recovery project operations commence. However, the director shall have discretionary authority to select a different period of time to establish the decline curve if deemed necessary to obtain a more accurate estimate of the ultimate production that would have been produced if the tertiary recovery project had not been commenced.
c. The production decline curve established in subdivision b of this subsection is projected from the end of the last month in which production was used to develop the decline curve to a producing rate of one barrel of oil per well per day. All production above the projected decline curve is incremental production and production below the decline curve is production which would have occurred in the absence of the tertiary recovery project. The total projected production below the curve, on a monthly basis in numerical form, is derived from the projected production decline curve. A copy of the projected monthly production below the curve, in numerical form, will be furnished to the unit operator and the tax commissioner.
4. The commission will hold a hearing to establish a decline curve and a projection of the curve from which incremental production can be determined. At the hearing the project operator of a tertiary recovery project must introduce evidence regarding the work proposed or accomplished which will result in incremental production, and evidence showing that the project is a qualifying project. Application for the hearing may, at the discretion of the project operator, be made prior or subsequent to the commencement of a tertiary recovery project.

N.D. Admin Code 43-02-10-07

Effective May 1, 1992.

General Authority: NDCC 38-08-04

Law Implemented: NDCC 38-08-04, 57-51.1-03