N.D. Admin. Code 43-02-03-40

Current through Supplement No. 392, April, 2024
Section 43-02-03-40 - Gas-oil ratio test

Each operator shall take a gas-oil ratio test within thirty days following the completion or recompletion of an oil well. Each test shall be conducted using standard industry practices unless otherwise specified by the director. The initial gas-oil ratio must be reported on the well completion or recompletion report (form 6 or form provided by the commission). Subsequent gas-oil ratio tests must be performed on producing wells when the producing pool appears to have reached bubble point. After the discovery of a new pool, each operator shall make additional gas-oil ratio tests as directed by the director or provided for in field rules. During tests each well shall be produced at a maximum efficient rate. The director may shut in any well for failure to make such test until such time as a satisfactory test can be made, or satisfactory explanation given. The results of all gas-oil ratio tests shall be submitted to the director on form 9, which shall be accompanied by a statement that the data on form 9 is true and correct.

N.D. Admin Code 43-02-03-40

Amended by Administrative Rules Supplement 2014-352, April 2014, effective April 1, 2014. .
Amended by Administrative Rules Supplement 2016-362, October 2016, effective 10/1/2016.
Amended by Administrative Rules Supplement 376, April 2020, effective 4/1/2020.

General Authority: NDCC 38-08-04

Law Implemented: NDCC 38-08-04