The commission will mail a copy of the approved notice to the surface owner.
All equipment, waste, and debris shall be removed from the site. All pipelines shall be purged and abandoned pursuant to section 43-02-03-29.1. Flow lines shall be removed if buried less than three feet [91.44 centimeters] below final contour.
N.D. Admin Code 43-02-03-34.1
General Authority: NDCC 38-08-04
Law Implemented: NDCC 38-08-04