N.D. Admin. Code 43-02-03-34

Current through Supplement No. 392, April, 2024
Section 43-02-03-34 - Method of plugging

All wells shall be plugged in a manner which will confine permanently all oil, gas, and water in the separate strata originally containing them. This operation shall be accomplished by the use of mud-laden fluid, cement, and plugs, used singly or in combination as may be approved by the director. All casing strings shall be cut off at least three feet [91.44 centimeters] below the final surface contour, and a cap with file number shall be welded thereon. Core or stratigraphic test holes drilled to or below sands containing freshwater shall be plugged in accordance with the applicable provisions recited above. After plugging, the site must be reclaimed pursuant to section 43-02-03-34.1.

N.D. Admin Code 43-02-03-34

Amended by Administrative Rules Supplement 2014-352, April 2014, effective April 1, 2014. .
Amended by Administrative Rules Supplement 2016-362, October 2016, effective 10/1/2016.

General Authority: NDCC 38-08-04

Law Implemented: NDCC 38-08-04