N.D. Admin. Code 43-02-03-24

Current through Supplement No. 392, April, 2024
Section 43-02-03-24 - [Effective until 4/1/2024] Pulling string of casing

In pulling strings of casing from any oil, gas, or injection well, the space above the casing stub shall be kept and left full of fluid with adequate gel strength and specific gravity, cement, or combination thereof, to seal off all freshwater and saltwater strata and any strata bearing oil or gas not producing. No casing shall be removed without the prior approval of the director.

N.D. Admin Code 43-02-03-24

Amended by Administrative Rules Supplement 2014-352, April 2014, effective April 1, 2014. .

General Authority: NDCC 38-08-04

Law Implemented: NDCC 38-08-04