All allocation meters must be approved prior to installation and use. The application for approval must be on a facility sundry notice and shall include the make and model number of the meter, the meter or station number, the serial number, the well name, its location, and the date the meter will be placed in service.
Meter installations for measuring production from oil or gas wells, or both, must be constructed to American petroleum institute or American gas association standards or to meter manufacturer's recommended installation. Meter installations constructed in accordance with American petroleum institute or American gas association standards in effect at the time of installation shall not automatically be required to retrofit if standards are revised. The director will review any revised standards, and when deemed necessary will amend the requirements accordingly.
Any meter tests performed by a person not registered with the director will not be accepted as a valid test.
A register of variances requested and approved must be maintained by the director.
N.D. Admin Code 43-02-03-14.2
General Authority: NDCC 38-08-04
Law Implemented: NDCC 38-08-04