N.D. Admin. Code 43-02-02.4-48

Current through Supplement No. 394, October, 2024
Section 43-02-02.4-48 - Rock profile determination

The operator shall determine the cavity roof position not less than biennially. Generally accepted wireline logging methods shall be utilized. The results of the determination shall be filed with the director not more than sixty days after completion and shall include all wireline logs run.

N.D. Admin Code 43-02-02.4-48

Effective July 1, 2013.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02