N.D. Admin. Code 43-02-02.4-37

Current through Supplement No. 394, October, 2024
Section 43-02-02.4-37 - Secondary containment - Certification

Upon completion of the construction of a surface facility, but before its use, an operator of a well shall certify to the director that the secondary containment area is constructed according to the approved plan. Following advance notice, the director may require an inspection of a surface facility before it is put into service. If an inspection is required it shall be conducted within five business days of the receipt of certification.

N.D. Admin Code 43-02-02.4-37

Effective July 1, 2013.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02