Upon completion of the construction of a surface facility, but before its use, an operator of a well shall certify to the director that the secondary containment area is constructed according to the approved plan. Following advance notice, the director may require an inspection of a surface facility before it is put into service. If an inspection is required it shall be conducted within five business days of the receipt of certification.
N.D. Admin Code 43-02-02.4-37
General Authority: NDCC 38-12-02
Law Implemented: NDCC 38-12-02