N.D. Admin. Code 43-02-02.4-16

Current through Supplement No. 394, October, 2024
Section 43-02-02.4-16 - Permit term
1. The permit will remain in effect as long as active mining continues at a mine site and the operator remains in full compliance with all permit conditions.
2. A permit shall be reviewed and may be required to be modified or revised due to:
a. Additional applicable requirements under North Dakota Century Code chapters 38-12 and 38-12.1 and North Dakota Administrative Code article 43-02; or
b. The director determining that the permit contains a material mistake or that inaccurate statements were made in establishing the terms or conditions of the permit.
3. If the permit area contains property owned by the federal or state government, the expiration or termination of the government's authorization of the operator to conduct mining operations on the property automatically revokes the operator's permit, but does not suspend the operator's reclamation operations.

N.D. Admin Code 43-02-02.4-16

Effective July 1, 2013.

General Authority: NDCC 38-12-03

Law Implemented: NDCC 38-12-03