N.D. Admin. Code 43-02-02.2-36

Current through Supplement No. 392, April, 2024
Section 43-02-02.2-36 - Construction quality assurance plan
1. The operator shall develop, for the department's approval, a construction quality assurance plan that addresses all aspects of constructing surface facilities. The plan must include the following:
a. A description of the responsibilities and authorities of key personnel, including the level of experience and training;
b. A description of the required level of experience, training, and duties of the contractor, the contractor's employees, and the quality assurance inspectors;
c. A description of the testing protocols for every major phase of construction, including the frequency of inspections, field testing, and sampling for laboratory testing;
d. The sampling and field testing procedures and the equipment to be used;
e. The calibration of field testing equipment;
f. The laboratory procedures to be used; and
g. Documentation to be maintained.
2. The operator shall submit the construction quality assurance plan at the same time the plans and specifications required in section 43-02-02.2-35 are submitted.

N.D. Admin Code 43-02-02.2-36

Effective January 1, 2009.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02