N.D. Admin. Code 43-02-02.1-14

Current through Supplement No. 395, January, 2025
Section 43-02-02.1-14 - Mechanical integrity

A permit for any Class III well or injection project which lacks mechanical integrity must include a condition prohibiting injection operations until the state geologist is satisfied that the specifications for mechanical integrity listed in 40 CFR 146.08 have been met.

N.D. Admin Code 43-02-02.1-14

Effective March 1, 1984.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-01