N.D. Admin. Code 43-02-02-22.2

Current through Supplement No. 394, October, 2024
Section 43-02-02-22.2 - Subsurface pressure test

The operator shall conduct a subsurface pressure test on the discovery well of any new pool discovered and shall report the results to the director within thirty days after the completion of such discovery well. Drill stem test pressures are acceptable. After the discovery of a new pool, each operator shall make additional subsurface pressure tests as directed by the director or provided for in field rules. All tests shall be made by a person qualified by both training and experience to make such tests and with an approved subsurface pressure instrument. All wells shall remain completely shut in for at least forty-eight hours prior to the test. The subsurface determination shall be obtained as close as possible to the midpoint of the productive interval of the reservoir The report of the reservoir pressure test shall be filed on form 9-sm.

The director may shut in any well for failure to make such test until such time as a satisfactory test has been made or satisfactory explanation given.

N.D. Admin Code 43-02-02-22.2

Effective July 1, 2013.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02