N.D. Admin. Code 43-02-02-12.4

Current through Supplement No. 394, October, 2024
Section 43-02-02-12.4 - Pipeline design and construction requirements
1. Topsoil must be removed before the installation of underground pipelines and replaced after pipelines are installed.
2. Pipeline systems must be constructed with materials that have the strength, thickness, and chemical properties that prevent failure due to pressure gradients, physical contact with the waste or fluids to which the pipes are exposed, climatic conditions, stress of installation, seismic, and stress of daily operation.
3. Design and construction requirements for wellfield pipelines and pipelines between the wellfield and processing and satellite facilities must include an early detection and shutdown capability in the event of pressure drop or loss of flow. This may include automatic motor-operated valves with pressure transmitters and manually operated valves or devices.

N.D. Admin Code 43-02-02-12.4

Effective July 1, 2013.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02